Monitoring requirements.

§ 49.4166 Monitoring requirements.

(a) Each owner and operator must measure the barrels of oil produced at the oil and natural gas production facility each time the oil is unloaded from the produced oil storage tanks using the methodologies of tank gauging or positive displacement metering system, as appropriate, as established by the U.S. Department of the Interior's Bureau of Land Management at 43 CFR part 3160, in the “Onshore Oil and Gas Operations; Federal and Indian Oil & Gas Leases; Onshore Oil and Gas Order No. 4; Measurement of Oil”.

(b) Each owner or operator must monitor the hours that each pit flare is operated to control produced natural gas and natural gas emissions in the event that natural gas recovered for pipeline injection must be diverted to a backup control device because injection is temporarily infeasible and there is no enclosed combustor or utility flare at the oil and natural gas production facility.