Construction and operational control measures.

§ 49.4164 Construction and operational control measures.

(a) Each owner or operator must operate and maintain all liquid and gas collection, storage, processing and handling operations, regardless of size, so as to minimize leakage of natural gas emissions to the atmosphere.

(b) During all oil and natural gas well completion operations or recompletion operations at an oil and natural gas production facility and prior to the first date of production of each oil and natural gas well, each owner or operator must, at a minimum, route all casinghead natural gas to a utility flare or a pit flare capable of reducing the mass content of VOC in the natural gas emissions vented to it by at least 90.0 percent or greater and operated as specified in §§ 49.4165 and 49.4166.

(c) Beginning with the first date of production from any one oil and natural gas well at an oil and natural gas production facility, each owner or operator must, at a minimum, route all natural gas emissions from production operations and storage operations to a control device capable of reducing the mass content of VOC in the natural gas emissions vented to it by at least 90.0 percent or greater and operated as specified in §§ 49.4165 and 49.4166.

This document is only available to subscribers. Please log in or purchase access.