Control strategy: Carbon monoxide.

§ 52.1528 Control strategy: Carbon monoxide.

(a) Approval—On February 1, 1999, the New Hampshire Department of Environmental Services submitted a revision to the State Implementation Plan to remove the Nashua Inspection/Maintenance program for carbon monoxide that ceased operating on January 1, 1995. The Nashua Inspection/Maintenance was originally approved at § 52.1520(c)(39). The Nashua Inspection/Maintenance program was replaced with controls consisting of the existing federal Tier 1 emission standards for new vehicles and the federal reformulated gasoline program.

(b) Approval—On February 2, 1999, the New Hampshire Department of Environmental Services submitted a request to redesignate the City of Manchester carbon monoxide nonattainment area to attainment for carbon monoxide. As part of the redesignation request, the State submitted a maintenance plan as required by 175A of the Clean Air Act, as amended in 1990. Elements of the section 175A maintenance plan include a base year (1990 attainment year) emission inventory for carbon monoxide, a demonstration of maintenance of the carbon monoxide NAAQS with projected emission inventories to the year 2010 for carbon monoxide, a plan to verify continued attainment, a contingency plan, and an obligation to submit additional information in eight years acknowledging that the maintenance plan will remain in effect through the year 2020, as required by the Clean Air Act. If the area records a violation of the carbon monoxide NAAQS (which must be confirmed by the State), New Hampshire will implement one or more appropriate contingency measure(s) which are contained in the contingency plan. The menu of contingency measures includes the enhanced safety inspection program and New Hampshire's low emission vehicle program (NLEV) as contingency measures. The redesignation request establishes a motor vehicle emissions budget of 55.83 tons per day for carbon monoxide to be used in determining transportation conformity for the Manchester area. The redesignation request and maintenance plan meet the redesignation requirements in sections 107(d)(3)(E) and 175A of the Act as amended in 1990, respectively.

This document is only available to subscribers. Please log in or purchase access.