Identification of plan.

§ 52.570 Identification of plan.

(a) Purpose and scope. This section sets forth the applicable State implementation plan for Georgia under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.

(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to August 31, 2022, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraph (c) and (d) of this section with EPA approval dates after August 31, 2022, for Georgia will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section.

(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may also inspect the material with an EPA approval date prior to August 31, 2022, for Georgia, at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, please email fedreg.legal@nara.gov or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

(c) EPA-Approved Georgia Regulations.

Table 1 to Paragraph (c)—EPA-Approved Georgia Regulations

State citation Title/subject State effective date EPA approval date Explanation
391-3-1-.01Definitions7/29/20204/5/2022, 87 FR 19643Except the first paragraph, sections (a)-(nn), (pp)-(ccc), (eee)-(jjj), (nnn)-(bbbb), (dddd)-(kkkk), (mmmm), (rrrr)-(ssss), approved on 12/4/2018 with a state effective date of 7/20/2017; sections (ddd) and (cccc) approved on 2/2/1996 with a state effective date of 11/20/1994; (nnnn), approved on 1/5/2017 with a state effective date of 8/14/2016; and sections (oooo), (pppp), which are not in the SIP.
391-3-1-.02Provisions
391-3-1-.02(1)General Requirements3/20/19799/18/1979, 44 FR 54047
391-3-1-.02(2)Emission Standards
391-3-1-.02(2)(a)General Provisions8/1/20137/28/2017, 82 FR 35106Except for paragraph 391-3-1-.02(2)(a)1.
391-3-1-.02(2)(b)Visible Emissions1/17/19799/18/1979, 44 FR 54047
391-3-1-.02(2)(c)Incinerators7/23/201811/22/2019, 84 FR 64427
391-3-1-.02(2)(d)Fuel-burning Equipment7/20/20052/9/2009, 75 FR 6309
391-3-1-.02(2)(e)Particulate Emission from Manufacturing Processes8/1/20137/28/2017, 82 FR 35106
391-3-1-.02(2)(f)Normal Superphosphate Manufacturing Facilities1/17/19799/18/1979, 44 FR 54047
391-3-1-.02(2)(g)Sulfur Dioxide7/17/20027/9/2003, 68 FR 40786
391-3-1-.02(2)(h)Portland Cement Plants1/17/19799/18/1979, 44 FR 54047
391-3-1-.02(2)(i)Nitric Acid Plants1/17/19799/18/1979, 44 FR 54047
391-3-1-.02(2)(j)Sulfuric Acid Plants1/17/19799/18/1979, 44 FR 54047
391-3-1-.02(2)(k)Particulate Emission from Asphaltic Concrete Hot Mix Plants1/17/19799/18/1979, 44 FR 54047
391-3-1-.02(2)(n)Fugitive Dust1/17/19799/18/1979, 44 FR 54047
391-3-1-.02(2)(p)Particulate Emissions from Kaolin and Fuller's Earth Processes8/1/20137/28/2017, 82 FR 35106
391-3-1-.02(2)(q)Particulate Emissions from Cotton Gins8/1/20137/28/2017, 82 FR 35106
391-3-1-.02(2)(r)Particulate Emissions from Granular and Mixed Fertilizer Manufacturing Units1/27/19725/31/1972, 37 FR 10842
391-3-1-.02(2)(t)VOC Emissions from Automobile and Light Duty Truck Manufacturing3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(u)VOC Emissions from Can Coating9/16/19929/28/2012, 77 FR 59554
391-3-1-.02(2)(v)VOC Emissions from Coil Coating9/16/19929/28/2012, 77 FR 59554
391-3-1-.02(2)(w)VOC Emissions from Paper Coating3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(x)VOC Emissions from Fabric and Vinyl Coating9/16/19929/28/2012, 77 FR 59554
391-3-1-.02(2)(y)VOC Emissions from Metal Furniture Coating3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(z)VOC Emissions from Large Appliance Surface Coating3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(aa)VOC Emissions from Wire Coating9/16/19929/28/2012, 77 FR 59554
391-3-1-.02(2)(bb)Petroleum Liquid Storage1/9/199110/13/1992, 57 FR 46780
391-3-1-.02(2)(cc)Bulk Gasoline Terminals1/9/199110/13/1992, 57 FR 46780
391-3-1-.02(2)(dd)Cutback Asphalt1/17/19799/18/1979, 44 FR 54047
391-3-1-.02(2)(ee)Petroleum Refinery1/9/199110/13/1992, 57 FR 46780
391-3-1-.02(2)(ff)Solvent Metal Cleaning5/29/19964/26/1999, 64 FR 20186
391-3-1-.02(2)(gg)Kraft Pulp Mills8/1/20137/28/2017, 82 FR 35106
391-3-1-.02(2)(hh)Petroleum Refinery Equipment Leaks6/24/19942/2/1996, 61 FR 3817
391-3-1-.02(2)(ii)VOC Emissions from Surface Coating of Miscellaneous Metal Parts and Products3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(jj)VOC Emissions from Surface Coating of Flat Wood Paneling3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(kk)VOC Emissions from Synthesized Pharmaceutical Manufacturing12/18/198011/24/1981, 46 FR 57486
391-3-1-.02(2)(ll)VOC Emissions from the Manufacture of Pneumatic Rubber Tires12/18/198011/24/1981, 46 FR 57486
391-3-1-.02(2)(mm)VOC Emissions from Graphic Arts Systems3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(nn)VOC Emissions from External Floating Roof Tanks12/18/198011/24/1981, 46 FR 57486
391-3-1-.02(2)(oo)Fiberglass Insulation Manufacturing Plants12/18/198011/24/1981, 46 FR 57486
391-3-1-.02(2)(pp)Bulk Gasoline Plants6/8/20089/28/2012, 77 FR 59554
391-3-1-.02(2)(qq)VOC Emissions from Large Petroleum Dry Cleaners4/3/199110/13/1992, 57 FR 46780
391-3-1-.02(2)(rr)Gasoline Dispensing Facility—Stage I10/25/20218/2/2023, 88 FR 50770Except for subparagraph 391-3-1-.02(2)(rr)16.(x), which was approved on 9/28/2012 with a state-effective date of 6/8/2008.
391-3-1-.02(2)(ss)Gasoline Transport Systems and Vapor Collection Systems8/1/20137/28/2017, 82 FR 35106
391-3-1-.02(2)(tt)VOC Emissions from Major Sources6/8/20089/28/2012, 77 FR 59554
391-3-1-.02(2)(uu)Visibility Protection10/31/19851/28/1986, 51 FR 3466
391-3-1-.02(2)(vv)Volatile Organic Liquid Handling and Storage4/12/20099/28/2012, 77 FR 59554
391-3-1-.02(2)(yy)Emissions of Nitrogen Oxides from Major Sources4/12/20099/28/2012, 77 FR 59554
391-3-1-.02(2)(ccc)VOC Emissions from Bulk Mixing Tanks4/12/20099/28/2012, 77 FR 59554
391-3-1-.02(2)(ddd)VOC Emissions from Offset Lithography and Letterpress3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(eee)VOC Emissions from Expanded Polystyrene Products Manufacturing4/12/20099/28/2012, 77 FR 59554
391-3-1-.02(2)(fff)Particulate Matter Emissions from Yarn Spinning Operations6/15/199812/2/1999, 64 FR 67491
391-3-1-.02(2)(hhh)Wood Furniture Finishing and Cleaning Operations4/12/20099/28/2012, 77 FR 59554
391-3-1-.02(2)(jjj)NOX Emissions from Electric Utility Steam Generating Units3/12/200711/27/2009, 74 FR 62249
391-3-1-.02(2)(kkk)VOC Emissions from Aerospace Manufacturing and Rework Facilities2/17/20193/11/2020, 85 FR 14145
391-3-1-.02(2)(lll)NOX Emissions from Fuel-burning Equipment4/12/20099/28/2012, 77 FR 59554
391-3-1-.02(2)(mmm)NOX Emissions from Stationary Gas Turbines and Stationary Engines used to Generate Electricity5/4/20149/1/2015, 80 FR 52627
391-3-1-.02(2)(nnn)NOX Emissions from Large Stationary Gas Turbines4/20/20035/28/2019, 84 FR 24393
391-3-1-.02(2)(rrr)NOX Emissions from Small Fuel-Burning Equipment4/12/20099/28/2012, 77 FR 59554
391-3-1-.02(2)(vvv)VOC Emissions from Coating Miscellaneous Plastic Parts and Products3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(yyy)VOC Emissions from the Use of Miscellaneous Industrial Adhesives3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(zzz)VOC Emissions from Fiberglass Boat Manufacturing3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(2)(aaaa)Industrial Cleaning Solvents3/7/20129/28/2012, 77 FR 59554
391-3-1-.02(3)Sampling6/15/199812/2/1999, 64 FR 67491
391-3-1-.02(4)Ambient Air Standards9/19/20222/6/2024, 89 FR 8076Except paragraphs (a), (c), (d), (e), (f), (g), and (h), approved on 12/4/2018 with a state effective date of 7/20/2017.
391-3-1-.02(5)Open Burning7/13/20065/28/2019, 84 FR 24393Except subparagraph 391-3-1-.02(5)(c), which was approved on July 10, 2001, with a state effective date of August 16, 2000.
391-3-1-.02(6)Source Monitoring8/1/20137/28/2017, 82 FR 35108Except paragraph (a)4., approved on 3/9/2022, with a state effective date of 10/25/2021.
391-3-1-.02(7)Prevention of Significant Deterioration of Air Quality (PSD)7/20/20179/16/2020, 85 FR 57707Except for the automatic rescission clause at 391-3-1-.02(7)(a)(2)(iv), which EPA disapproved on March 4, 2016.
Except for portions of Rule 391-3-1-.02(7) incorporating by reference 40 CFR 52.21(b)(2)(v), and 40 CFR 52.21(b)(3)(iii)(c), because those CFR provisions were indefinitely stayed by the Fugitive Emissions Rule in the March 30, 2011 rulemaking and have not been approved into the Georgia SIP.
391-3-1-.02(11)Compliance Assurance Monitoring6/15/199812/2/1999, 64 FR 67491
391-3-1-.02(12)Cross State Air Pollution Rule NOX Annual Trading Program7/23/20182/18/2020, 85 FR 8749
391-3-1-.02(13)Cross State Air Pollution Rule SO2 Annual Trading Program7/23/20182/18/2020, 85 FR 8749
391-3-1-.02(14)Cross State Air Pollution Rule NOX Ozone Season Trading Program7/23/20182/18/2020, 85 FR 8749
391-3-1-.03Permits
391-3-1-.03(1)Construction (SIP) Permit8/17/19948/30/1995, 60 FR 45048
391-3-1-.03(2)Operating (SIP) Permit12/26/20017/11/2002, 67 FR 45909Except subparagraph (e), which is not approved into the SIP.
391-3-1-.03(3)Revocation, Suspension, Modification or Amendment of Permits2/23/19799/18/1979, 44 FR 54047
391-3-1-.03(4)Permits Not Transferable11/20/19758/20/1976, 41 FR 35184
391-3-1-.03(5)Permits Public Records10/28/19922/2/1996, 61 FR 3819
391-3-1-.03(6)Exemptions7/29/20204/5/2022, 87 FR 19643With the exception of Rule 391-3-1-.03(6)(b)16.
391-3-1-.03(7)Combined Permits and Applications2/23/19799/18/1979, 44 FR 54047
391-3-1-.03(8)Permit Requirements9/26/20199/16/2020, 85 FR 57694
391-3-1-.03(11)Permit by Rule7/23/201811/22/2019, 84 FR 64427Except sections (a)-(b)(5) and (b)(7)-(b)(10), approved on 2/9/2010 with a state effective date of 7/20/2005; section (b)(6), approved on 3/13/2000 with a state effective date of 12/25/1997; and the phrase “or enforceable as a practical matter” in section .03(11)(b)11.(i), which is not in the SIP.
391-3-1-.03(12)Generic Permit8/17/19948/30/1995, 60 FR 45048
391-3-1-.03(13)Emission Reduction Credits9/26/20199/22/2020, 85 FR 59436Except subparagraph 391-3-1-.03(13)(f), which was approved into the SIP with a state effective date of 7/18/2001, and subparagraphs (b), (c), (e), (g), and (i), which were approved into the SIP with a state effective date of 2/16/2000.
391-3-1-.04Air Pollution Episodes11/20/19758/20/1976, 41 FR 35184
391-3-1-.07Inspections and Investigations11/20/19758/20/1976, 41 FR 35184
391-3-1-.08Confidentiality of Information11/20/19758/20/1976, 41 FR 35184
391-3-1-.09Enforcement11/22/19922/2/1996, 61 FR 3819
391-3-1-.10Continuance of Prior Rules11/22/19922/2/1996, 61 FR 3819
391-3-1-.15Georgia Transportation Conformity and Consultation Interagency Rule10/6/20106/15/2012, 77 FR 35866
391-3-20Enhanced Inspection and Maintenance
391-3-20-.01Definitions3/21/20232/9/2024, 89 FR 8996
391-3-20-.02Covered Counties1/9/20055/24/2007, 72 FR 29075
391-3-20-.03Covered Vehicles; Exemptions3/21/20232/9/2024, 89 FR 8996
391-3-20-.04Emission Inspection Procedures3/21/20232/9/2024, 89 FR 8996
391-3-20-.05Emission Standards3/21/20232/9/2024, 89 FR 8996
391-3-20-.06On-Road Testing of Exhaust Emissions by Remote Sensing Technology or Other Means2/17/20198/24/2020, 85 FR 52047
391-3-20-.07Inspection Equipment System Specifications4/13/20219/22/2022, 87 FR 57834
391-3-20-.08Quality Control and Equipment Calibration Procedures3/28/20188/24/2020, 85 FR 52047
391-3-20-.09Inspection Station Requirements4/19/20222/9/2024, 89 FR 8996
391-3-20-.10Certificates of Authorization4/19/20222/9/2024, 89 FR 8996
391-3-20-.11Inspector Qualifications and Certification3/21/20232/9/2024, 89 FR 8996
391-3-20-.12Schedules for Emission Inspections6/19/20144/10/2017, 82 FR 17128
391-3-20-.13Certificate of Emission Inspection4/19/20222/9/2024, 89 FR 8996
391-3-20-.15Repairs and Retests4/19/20222/9/2024, 89 FR 8996
391-3-20-.16Extensions and Reciprocal Inspections6/19/20144/10/2017, 82 FR 17128
391-3-20-.17Waivers4/19/20222/9/2024, 89 FR 8996
391-3-20-.18Sale of Vehicles3/28/20188/24/2020, 85 FR 52047
391-3-20-.19Management Contractor6/19/20144/10/2017, 82 FR 17128
391-3-20-.20Referee Program3/28/20188/24/2020, 85 FR 52047
391-3-20-.21Inspection Fees6/19/20144/10/2017, 82 FR 17128
391-3-20-.22Enforcement4/19/20222/9/2024, 89 FR 8996
This document is only available to subscribers. Please log in or purchase access.